Screen readers: Two navigational links to follow.Skip to site navigation.Skip to page content.
The University of Iowa News Services
The University of Iowa News Services Home News Releases UI in the News Subscribe to UI News Contact Us

University of Iowa News Release

 

Aug. 4, 2011

Media Advisory: Floodwall being installed at Art Building West
 
WHAT: Contractors are installing 900 linear feet of floodwall around the University of Iowa's Art Building West, one of dozens of UI facilities damaged or destroyed by the floods of 2008. This is a drill to test the assembly of the reusable aluminum planks and vertical supports that will be deployed around the building as needed if floodwaters threaten. When erected, the wall will reach 12 feet at its highest point. After assembling the entire structure, the components will be dismantled and stored on campus.  

WHEN: 11 a.m. Friday, Aug. 5.

WHERE: Art Building West is located on North Riverside Drive. Metered parking is available at the Theatre Building, just north of Music West Interim Building (Museum of Art).
 
WHO: UI officials will be on site to answer questions during the media availability, including Dan Heater, director of Building and Landscape Services with UI Facilities Management, and Dean Dykstra, construction project manager with UI Facilities Management. 
 
STORY SOURCE: University of Iowa News Service, 300 Plaza Centre One, Iowa City, Iowa 52242-2500

MEDIA CONTACTS: Dan Heater, 319-335-5038, dan-heater@uiowa.edu; Dean Dykstra, 319-335-2843, dean-dykstra@uiowa.edu; Stephen Pradarelli, University News Services, 319-384-0007, stephen-pradarelli@uiowa.edu